The Final Product Of Our Dome ++ me(nklin)
(since it is group work, the picture posted maybe will same for the group members)Theater Of Your Mind- A place where the actor can rewind the journey of their life. They will bear in mind that the intention they want to achieve success in their career. A peaceful and imaginable place.Group :
EASY 5Group Member :
1) Teh Yee Hong (Architecture) *
2) Cheng Bee Ting (Interior Design)
3) Ng Kang Lin (Building Technology)
4) Cheng Fang Chee (Construction Management)
5) Liu Ying Huan (Urban and Regional Planning)
* Group Leader
Preparation ProcessMATERIALS USED
1) PVC PIPE – 15 mm
2) PLASTIC PLATE
3) BOLT NUT + WASHER
4)WATERPROOF SHEET
Nodes & Paths
The design concept of our connector
(graphic designed by Teh Yee Hong)
Erection PracticeAll of the group members try to do the 1st erection at ying huan's hostel~ it is hard for the 1st time
~ we waste up a lot of time to think how to connect all the structure

Progession 50%
~ The Structure of the dome can be seen
~ The plate connector performed well

Dome Completed 100%
~ The nodes and the paths of the dome support the whole structure

Testing whether the dome can accommodate 5 people or not
~ The dome can fill in roughly 12 people
Domes DayIt was a sunny day, good weather for erection
Dome pack submission and prepare for the photo registration
~ the material is well packaged and prefabricated
Our site - group NO 4~ luckily we are group no 4 and don`t need to walk a long long way

Prepare for the war......

Everything done in less than 20 minutes
~ thank to every group members with their co-operation








Here come to the end
Firstly, i felt inspired after finished the dome, the feeling came itself, it is totally different
with we won prize or trophy....
Although we use many of time and lack of sleep, all of us felt that it`s
WORTH !!
these is the first time we built the dome ourself, it impressed me....
The experience we gained....... it`s hard to describe
I love this assignment, it is nice to be at HBP...