Thursday, September 25, 2008

Homepage of nklin

Nklin`s Profile

School : Housing, building And Planning (more)

Major : Building Technology (more)

Address : Johor, Malaysia (more)

It is nice to be in HBP....but.... think 1st before asking something...^^


Rag 132 - Built Environment & human Settlement

Assignment A - USM 38th Convocation 2008 (Link)

Assignment B - Real Construction~Our Dome In The Dome Spine (Link)


Friday, September 12, 2008

Our Dome In The Dome Spine

The Final Product Of Our Dome ++ me(nklin)



(since it is group work, the picture posted maybe will same for the group members)



Theater Of Your Mind

- A place where the actor can rewind the journey of their life. They will bear in mind that the intention they want to achieve success in their career. A peaceful and imaginable place.


Group : EASY 5

Group Member :

1) Teh Yee Hong (Architecture) *
2) Cheng Bee Ting (Interior Design)
3) Ng Kang Lin (Building Technology)
4) Cheng Fang Chee (Construction Management)
5) Liu Ying Huan (Urban and Regional Planning)

* Group Leader



Preparation Process

MATERIALS USED

1) PVC PIPE – 15 mm
2) PLASTIC PLATE
3) BOLT NUT + WASHER
4)WATERPROOF SHEET



Nodes & Paths

The design concept of our connector



(graphic designed by Teh Yee Hong)




Erection Practice

All of the group members try to do the 1st erection at ying huan's hostel
~ it is hard for the 1st time
~ we waste up a lot of time to think how to connect all the structure




Progession 50%

~ The Structure of the dome can be seen
~ The plate connector performed well




Dome Completed 100%

~ The nodes and the paths of the dome support the whole structure




Testing whether the dome can accommodate 5 people or not

~ The dome can fill in roughly 12 people





Domes Day

It was a sunny day, good weather for erection




Dome pack submission and prepare for the photo registration

~ the material is well packaged and prefabricated





Our site - group NO 4

~ luckily we are group no 4 and don`t need to walk a long long way




Prepare for the war......




Everything done in less than 20 minutes
~ thank to every group members with their co-operation

















Here come to the end



Firstly, i felt inspired after finished the dome, the feeling came itself, it is totally different
with we won prize or trophy....

Although we use many of time and lack of sleep, all of us felt that it`s WORTH !!
these is the first time we built the dome ourself, it impressed me....

The experience we gained....... it`s hard to describe

I love this assignment, it is nice to be at HBP...

Thursday, September 4, 2008

My Name In Dome FAQ's





Just after i checked the mail, i realised that my name appeared in the dome FAQ's. I still can remember the fantastic wednesday (3/9/08) when the lecture was asking who wrote the email to him.

Before the class started, i sat between ehong and a man. When the lecturer ask who was the person sent the email to him, the man beside me said softly, " wow, who ask those stupid questions" and my friends behind me
(Ah Moh^^, hun, bing)started to blame, " why so stupid asked the stupid questions"...haha..

Ehong and me just cant stop laughing ........It was a memorable day..^^

For others, i apologize if my questions had bring problem or bad feeling to you. Because at the beginning, i thought the lecturer will reply the email to me only.....who know....

Life is unpredictable..^^
Anyway, good luck everyone....